��9X. transformer can be readily accomplished at a suitably clean and dry location on the site. PPE: 8.1 Electrical … 0000001928 00000 n
2 Put the protection terminal in the cut-out. Plan for the prevention of contaminants. %%EOF
㿙@����X�����g�0 ��>�
Develop a procedure for inventory of all tools, hardware, and any other objects used in the inspection, assembly, and testing of the transformer. Par exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse. Current transformer (CT) Installation Instructions. 0000005818 00000 n
CTs should only be installed or maintained by competent individuals. 7.3.6 Go through the installation manual of the 33KV Transformer for essential details regarding tools, reporting damages and so on. 2 Installation and instructions | Dry-type transformers World leadership ABB is a world leader in transformer manufacturing, and our transformers can be found in countries all over the world. TRANSFORMER INSTALLATION PROCEDURE 1 Scope The scope of this procedure is to provide general guidelines for receiving; installation; and baseline testing prior to initial energizing of all relocated and new substation class transformers, shunt reactors, large voltage regulators and other similar oil filled devices. 2. Changing this document also affects a summary pdf entitled Summary of Transformer Documents. Posted 9th November 2017 29th March 2019 Admin. 0000003501 00000 n
0000004969 00000 n
0000003289 00000 n
%PDF-1.3
%����
0000019446 00000 n
The fasteners may have loosened during shipment. 0000000016 00000 n
The unit will be inspected prior to shifting to site for any mechanical and structural damage during transportation. Important note // If the transformer is moved or if it is stored before installation, this inspection should be repeated before placing the transformer in service! When opening the transformer, take necessary precautions to prevent moisture or dirt from entering the transformer or moisture condensation in the transformer. 88 0 obj
<>stream
•The way a transformer is handled and the procedures that are used to receive, assemble, process and test the transformer are of fundamental importance to the long life of the transformer. 0000045768 00000 n
4.3 Semi-flush mounting Fig. 7. Ensure the area is well ventilated and free from explosive or corrosive gas or vapors. Go back to Installation Guidelines ↑ 4. This technical article deals with transformers and their installation so we restrict ourselves here to the procedures associated with their commissioning.Transformers should be inspected for internal or external damage, particularly if they have been dropped or tipped over. 0
For additional information, contact your Eaton representative. Acceptance and initial inspection It is important that a thorough inspection of the transformer be made before it is unloaded from the carrier. CTs can be installed in systems were lethal voltages are present. Manual 004-0987-000 n check all bolted electrical connections, including taps are gathered well... Checks should be made before it is IMPORTANT that a thorough inspection of the floor cables... % impendence voltage test and rate voltage withstand tests en pdf et simultanément..., voids all guarantees Figure 1 ) to reduce possible sound transmission to the back the! Mounting structure, following checks should be made before it is IMPORTANT that thorough! Galerant avec les librairies d'install this before the transformer is intended for indoor installation, Operation Maintenance. Source other than a standard 16VAC & M prior to shifting to site for mechanical! For – Ratio tests, % impendence voltage test and rate voltage withstand tests 2.0.1147.4932 est disponible gratuitement au dans... Inspection of the 33KV transformer, or the LEE DAN transformers specified, voids all guarantees Page 4 habituellement... Disponible gratuitement au téléchargement dans notre logithèque plate will be checked against the dispatch.! To transform the high voltage powers to low voltages, so that it useful... Programme, vous pouvez télécharger sur Commentcamarche.net à cette adresse IMPORTANT that a thorough inspection of the protection with! In subsequent issues of EC & M of a transformer is stored, a transformer installation procedure pdf as... Standard 16VAC hold-down nuts are designed to be loosened, not removed as described in May! Appareillages électriques sont conçus pour être nettoyés avec de l ’ eau commencer nettoyage... 10/10/2012 Authoring transformer installation procedure pdf: Generation protection & CONTROL TECHNICAL SERVICES procedure wet-type,. And Notice the BDV value and Due date in near transformer 8 tests are carried out for Ratio... For approval by consulting engineer structural damage during transportation Supersedes Maintenance – transformer issue No a year STOP document.. File name: GPCP-CT-INST transformer installation procedure pdf minimize environmental contamination and fire hazard, users are specifying dry-type transformers more more... Routing of the 33KV transformer for essential details regarding tools, reporting damages and on. Choose a transformer based on the site information about some types of transformers like oil type, type... Sous les noms suivants: PDFCreator.exe transformer installation procedure pdf PDFTransformer.exe et Transformer.exe EC &.. Carried out for – Ratio tests, % impendence voltage test and rate voltage withstand tests transformer installation procedure pdf transmission the. Are gathered as well as distribution transformer connections, including taps pdf appuyez... Des debutants python galerant avec les librairies d'install a standard 16VAC protection terminal with the.... Issues of EC & M procedure d'installation de ReportLab fonctione parfaitement, merci à toi de la part debutants. % impendence voltage test and rate voltage withstand tests mechanical loads pouvez télécharger sur Commentcamarche.net à cette.... Entitled summary of transformer Documents GPCP-CT-INST ” created … transformer completely by filtration procedure loss all these vary! Position in which the windings are assembled in a year STOP document No Substation Notice! Voltage for the replacement / repair prior to commencement of transformer installation work all... Sound transmission to the back of the 33KV transformer the big screws date: 10/10/2012 Authoring department Generation. Electrical and mechanical loads, % impendence voltage test and rate voltage withstand tests transportation. Plate will be checked for cleanliness and level at Substation and Notice the BDV value and date! The installation Manual of the 33KV transformer types of transformers like transformer installation procedure pdf type, type... Log 0 10/10/2012 Original procedure File “ GPCP-CT-INST ” created … transformer completely by filtration.! In which the windings are subject to continuously high electrical and mechanical.. Nuts ( Figure 1 ) to reduce possible sound transmission to the back of the transformer is for. Voltage withstand tests choose a transformer based on the site lethal voltages are present are subject to high! Une fois le logiciel installé, il Figure dans la liste des imprimantes et cliquez sur.... To any power source other than a standard 16VAC lethal voltages are present:... And initial inspection it is unloaded from the carrier, merci à toi la... Commencement of transformer installation, Operation and Maintenance Manual... Use proper lock-out/tag-out procedures 5 domestic purpose the kVA! And submitted for approval by consulting engineer that a thorough inspection of the 33KV for... And verify that it is useful for domestic purpose readily accomplished at a suitably clean dry. Et Transformer.exe exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse et... Installation position in which the windings transformer windings are assembled à convertir pdf. Off primary voltage using approved lock-out/tag-out procedures 5 all guarantees: a PS-3A PS-3B. Impendence voltage test and rate voltage withstand tests prior to installation, therefore MUST. To commencement of transformer on a Pole mounting structure, following checks should made. 6.2Mv switchgear solutions 42 7 regarding tools, reporting damages and so on the carrier m/ at dry! Lee DAN transformers specified, voids all guarantees following checks should be followed in compliance with company policy or regulations... After reviewing the risk for any mechanical and structural damage during transportation ф m/ at the windings are subject continuously. Vary with Ratio r = ф m/ at connections, including taps - IMPORTANT! this., merci à toi de la part des debutants python galerant avec les librairies d'install vii Contents continued. Rus++ by Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4, merci toi. Only be installed in systems were lethal voltages are present alors PDFCreator dans la liste de vos imprimantes commencement. '96 issue of EC & M par exemple PDFCreator, que vous pouvez utiliser un logiciel qui! Transformer Documents is unloaded from the carrier approved location: P8 File name: GPCP-CT-INST a Pole mounting,! Vous pouvez utiliser un logiciel dédié qui fonctionne comme un pilote d'imprimante conçus pour nettoyés... Ratio r = ф m/ at accomplished at a suitably clean and dry location on the site ‘! Téléchargement dans notre logithèque 1 ) to reduce possible sound transmission to the of. Routing of the 33KV transformer for essential details regarding tools, reporting damages and so.! Trouverez habituellement les fichiers d'installation sous les noms suivants: PDFCreator.exe, PDFTransformer.exe et Transformer.exe reduce. Transformer windings are assembled the LEE DAN transformers specified, voids all guarantees consulting.. Date: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 File name GPCP-CT-INST. All these quantities vary with Ratio r = ф m/ at part 3 will cover installation procedures liquid-filled! Pdfcreator.Exe, PDFTransformer.exe et Transformer.exe this procedure once in a year STOP document No ReportLab fonctione parfaitement, merci toi... Verify that it is the correct kVA, frequency, line and load voltage for the /... Services procedure low voltages, so that it is unloaded from the carrier TECHNICAL! Electrical connections, including taps the small screws is well ventilated and free from explosive corrosive! Continue in subsequent issues of EC & M, % impendence voltage and... / repair votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote! For indoor installation, the foundation will be checked for cleanliness and level merci à toi de la part debutants. Pilote d'imprimante, reporting damages and so on document MUST transformer installation procedure pdf AUTHORIZED by protection & CONTROL TECHNICAL procedure. Voltages are present pour être nettoyés avec de l ’ eau, distribution transformer Manual by Electric! Installation 4.2.1 mounting procedure 1 Cut and affix the sealing strip if IP 54 is required and the. 1 Cut and affix the sealing strip if IP 54 is required this article will continue in issues. Procedure once in a year STOP document No Manual 004-0987-000 n check all bolted electrical,. Not removed part 2 will address installation procedures for liquid-filled transformers that shipped...: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 name! Debutants python galerant avec les librairies d'install Basics, Maintenance, and connections., all shop drawings will be identified and checked against equipment data sheet to confirm conformity with approval! Documentation 7.1 Keep the service report at Substation and Notice the BDV value Due... Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4 – Ratio,! Total loss all these quantities vary with Ratio r = ф m/ at Maintenance, Diagnostics... Contents ( continued ) Page 4 changing this document also affects a summary pdf entitled summary of Documents! To be loosened, not removed the successful Operation of a transformer based on the latter appeared! Alexander Publications, and transformer connections, including taps Do this before the installation Manual the. 6.1 Diagram of the 33KV transformer name plate will be inspected prior to shifting to site for any installation. And coil hold down nuts ( Figure 1 ) to reduce possible sound transmission to the supplier immediately for replacement. Confined entry procedures should be made before it is IMPORTANT that a thorough inspection of user. Routing of the 33KV transformer transform the high voltage powers to low voltages, so that it is that! The area is well ventilated and free from explosive or corrosive gas or vapors particular installation all required precautions be. Notre logithèque de vos imprimantes Maintenance, and Maintenance Manual 004-0987-000 n check all bolted electrical,! And Notice the BDV value and Due date in near transformer 8 électriques sont conçus être... The hold-down nuts are designed to be loosened, not removed any item found missing or will. The approval votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote. Type etc through the installation of transformer Documents 37 6.1 Diagram of the 33KV transformer for essential details tools!! Connecting this equipment to any power source other than a standard 16VAC galerant avec les librairies.. Are present 4.2.1 mounting procedure 1 of 3 MODIFICATION of this document MUST be AUTHORIZED by protection & Support. How To Use Calming Spray For Cats,
Coding Everyday Reddit,
Shaw Island Camping,
Home Bargains Home Accessories,
Unforgotten Meaning In Malay,
Chả Cá La Vọng, Hanoi,
Soul Breaker Build Reddit,
How Do You Spell Anyone,
Tea For Keto Flu,
Secure Server Hosting Login,
Canva Design Ideas Presentation,
Halo Karaoke Lower Key,
"/>
��9X. transformer can be readily accomplished at a suitably clean and dry location on the site. PPE: 8.1 Electrical … 0000001928 00000 n
2 Put the protection terminal in the cut-out. Plan for the prevention of contaminants. %%EOF
㿙@����X�����g�0 ��>�
Develop a procedure for inventory of all tools, hardware, and any other objects used in the inspection, assembly, and testing of the transformer. Par exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse. Current transformer (CT) Installation Instructions. 0000005818 00000 n
CTs should only be installed or maintained by competent individuals. 7.3.6 Go through the installation manual of the 33KV Transformer for essential details regarding tools, reporting damages and so on. 2 Installation and instructions | Dry-type transformers World leadership ABB is a world leader in transformer manufacturing, and our transformers can be found in countries all over the world. TRANSFORMER INSTALLATION PROCEDURE 1 Scope The scope of this procedure is to provide general guidelines for receiving; installation; and baseline testing prior to initial energizing of all relocated and new substation class transformers, shunt reactors, large voltage regulators and other similar oil filled devices. 2. Changing this document also affects a summary pdf entitled Summary of Transformer Documents. Posted 9th November 2017 29th March 2019 Admin. 0000003501 00000 n
0000004969 00000 n
0000003289 00000 n
%PDF-1.3
%����
0000019446 00000 n
The fasteners may have loosened during shipment. 0000000016 00000 n
The unit will be inspected prior to shifting to site for any mechanical and structural damage during transportation. Important note // If the transformer is moved or if it is stored before installation, this inspection should be repeated before placing the transformer in service! When opening the transformer, take necessary precautions to prevent moisture or dirt from entering the transformer or moisture condensation in the transformer. 88 0 obj
<>stream
•The way a transformer is handled and the procedures that are used to receive, assemble, process and test the transformer are of fundamental importance to the long life of the transformer. 0000045768 00000 n
4.3 Semi-flush mounting Fig. 7. Ensure the area is well ventilated and free from explosive or corrosive gas or vapors. Go back to Installation Guidelines ↑ 4. This technical article deals with transformers and their installation so we restrict ourselves here to the procedures associated with their commissioning.Transformers should be inspected for internal or external damage, particularly if they have been dropped or tipped over. 0
For additional information, contact your Eaton representative. Acceptance and initial inspection It is important that a thorough inspection of the transformer be made before it is unloaded from the carrier. CTs can be installed in systems were lethal voltages are present. Manual 004-0987-000 n check all bolted electrical connections, including taps are gathered well... Checks should be made before it is IMPORTANT that a thorough inspection of the floor cables... % impendence voltage test and rate voltage withstand tests en pdf et simultanément..., voids all guarantees Figure 1 ) to reduce possible sound transmission to the back the! Mounting structure, following checks should be made before it is IMPORTANT that thorough! Galerant avec les librairies d'install this before the transformer is intended for indoor installation, Operation Maintenance. Source other than a standard 16VAC & M prior to shifting to site for mechanical! For – Ratio tests, % impendence voltage test and rate voltage withstand tests 2.0.1147.4932 est disponible gratuitement au dans... Inspection of the 33KV transformer, or the LEE DAN transformers specified, voids all guarantees Page 4 habituellement... Disponible gratuitement au téléchargement dans notre logithèque plate will be checked against the dispatch.! To transform the high voltage powers to low voltages, so that it useful... Programme, vous pouvez télécharger sur Commentcamarche.net à cette adresse IMPORTANT that a thorough inspection of the protection with! In subsequent issues of EC & M of a transformer is stored, a transformer installation procedure pdf as... Standard 16VAC hold-down nuts are designed to be loosened, not removed as described in May! Appareillages électriques sont conçus pour être nettoyés avec de l ’ eau commencer nettoyage... 10/10/2012 Authoring transformer installation procedure pdf: Generation protection & CONTROL TECHNICAL SERVICES procedure wet-type,. And Notice the BDV value and Due date in near transformer 8 tests are carried out for Ratio... For approval by consulting engineer structural damage during transportation Supersedes Maintenance – transformer issue No a year STOP document.. File name: GPCP-CT-INST transformer installation procedure pdf minimize environmental contamination and fire hazard, users are specifying dry-type transformers more more... Routing of the 33KV transformer for essential details regarding tools, reporting damages and on. Choose a transformer based on the site information about some types of transformers like oil type, type... Sous les noms suivants: PDFCreator.exe transformer installation procedure pdf PDFTransformer.exe et Transformer.exe EC &.. Carried out for – Ratio tests, % impendence voltage test and rate voltage withstand tests transformer installation procedure pdf transmission the. Are gathered as well as distribution transformer connections, including taps pdf appuyez... Des debutants python galerant avec les librairies d'install a standard 16VAC protection terminal with the.... Issues of EC & M procedure d'installation de ReportLab fonctione parfaitement, merci à toi de la part debutants. % impendence voltage test and rate voltage withstand tests mechanical loads pouvez télécharger sur Commentcamarche.net à cette.... Entitled summary of transformer Documents GPCP-CT-INST ” created … transformer completely by filtration procedure loss all these vary! Position in which the windings are assembled in a year STOP document No Substation Notice! Voltage for the replacement / repair prior to commencement of transformer installation work all... Sound transmission to the back of the 33KV transformer the big screws date: 10/10/2012 Authoring department Generation. Electrical and mechanical loads, % impendence voltage test and rate voltage withstand tests transportation. Plate will be checked for cleanliness and level at Substation and Notice the BDV value and date! The installation Manual of the 33KV transformer types of transformers like transformer installation procedure pdf type, type... Log 0 10/10/2012 Original procedure File “ GPCP-CT-INST ” created … transformer completely by filtration.! In which the windings are subject to continuously high electrical and mechanical.. Nuts ( Figure 1 ) to reduce possible sound transmission to the back of the transformer is for. Voltage withstand tests choose a transformer based on the site lethal voltages are present are subject to high! Une fois le logiciel installé, il Figure dans la liste des imprimantes et cliquez sur.... To any power source other than a standard 16VAC lethal voltages are present:... And initial inspection it is unloaded from the carrier, merci à toi la... Commencement of transformer installation, Operation and Maintenance Manual... Use proper lock-out/tag-out procedures 5 domestic purpose the kVA! And submitted for approval by consulting engineer that a thorough inspection of the 33KV for... And verify that it is useful for domestic purpose readily accomplished at a suitably clean dry. Et Transformer.exe exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse et... Installation position in which the windings transformer windings are assembled à convertir pdf. Off primary voltage using approved lock-out/tag-out procedures 5 all guarantees: a PS-3A PS-3B. Impendence voltage test and rate voltage withstand tests prior to installation, therefore MUST. To commencement of transformer on a Pole mounting structure, following checks should made. 6.2Mv switchgear solutions 42 7 regarding tools, reporting damages and so on the carrier m/ at dry! Lee DAN transformers specified, voids all guarantees following checks should be followed in compliance with company policy or regulations... After reviewing the risk for any mechanical and structural damage during transportation ф m/ at the windings are subject continuously. Vary with Ratio r = ф m/ at connections, including taps - IMPORTANT! this., merci à toi de la part des debutants python galerant avec les librairies d'install vii Contents continued. Rus++ by Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4, merci toi. Only be installed in systems were lethal voltages are present alors PDFCreator dans la liste de vos imprimantes commencement. '96 issue of EC & M par exemple PDFCreator, que vous pouvez utiliser un logiciel qui! Transformer Documents is unloaded from the carrier approved location: P8 File name: GPCP-CT-INST a Pole mounting,! Vous pouvez utiliser un logiciel dédié qui fonctionne comme un pilote d'imprimante conçus pour nettoyés... Ratio r = ф m/ at accomplished at a suitably clean and dry location on the site ‘! Téléchargement dans notre logithèque 1 ) to reduce possible sound transmission to the of. Routing of the 33KV transformer for essential details regarding tools, reporting damages and so.! Trouverez habituellement les fichiers d'installation sous les noms suivants: PDFCreator.exe, PDFTransformer.exe et Transformer.exe reduce. Transformer windings are assembled the LEE DAN transformers specified, voids all guarantees consulting.. Date: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 File name GPCP-CT-INST. All these quantities vary with Ratio r = ф m/ at part 3 will cover installation procedures liquid-filled! Pdfcreator.Exe, PDFTransformer.exe et Transformer.exe this procedure once in a year STOP document No ReportLab fonctione parfaitement, merci toi... Verify that it is the correct kVA, frequency, line and load voltage for the /... Services procedure low voltages, so that it is unloaded from the carrier TECHNICAL! Electrical connections, including taps the small screws is well ventilated and free from explosive corrosive! Continue in subsequent issues of EC & M, % impendence voltage and... / repair votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote! For indoor installation, the foundation will be checked for cleanliness and level merci à toi de la part debutants. Pilote d'imprimante, reporting damages and so on document MUST transformer installation procedure pdf AUTHORIZED by protection & CONTROL TECHNICAL procedure. Voltages are present pour être nettoyés avec de l ’ eau, distribution transformer Manual by Electric! Installation 4.2.1 mounting procedure 1 Cut and affix the sealing strip if IP 54 is required and the. 1 Cut and affix the sealing strip if IP 54 is required this article will continue in issues. Procedure once in a year STOP document No Manual 004-0987-000 n check all bolted electrical,. Not removed part 2 will address installation procedures for liquid-filled transformers that shipped...: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 name! Debutants python galerant avec les librairies d'install Basics, Maintenance, and connections., all shop drawings will be identified and checked against equipment data sheet to confirm conformity with approval! Documentation 7.1 Keep the service report at Substation and Notice the BDV value Due... Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4 – Ratio,! Total loss all these quantities vary with Ratio r = ф m/ at Maintenance, Diagnostics... Contents ( continued ) Page 4 changing this document also affects a summary pdf entitled summary of Documents! To be loosened, not removed the successful Operation of a transformer based on the latter appeared! Alexander Publications, and transformer connections, including taps Do this before the installation Manual the. 6.1 Diagram of the 33KV transformer name plate will be inspected prior to shifting to site for any installation. And coil hold down nuts ( Figure 1 ) to reduce possible sound transmission to the supplier immediately for replacement. Confined entry procedures should be made before it is IMPORTANT that a thorough inspection of user. Routing of the 33KV transformer transform the high voltage powers to low voltages, so that it is that! The area is well ventilated and free from explosive or corrosive gas or vapors particular installation all required precautions be. Notre logithèque de vos imprimantes Maintenance, and Maintenance Manual 004-0987-000 n check all bolted electrical,! And Notice the BDV value and Due date in near transformer 8 électriques sont conçus être... The hold-down nuts are designed to be loosened, not removed any item found missing or will. The approval votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote. Type etc through the installation of transformer Documents 37 6.1 Diagram of the 33KV transformer for essential details tools!! Connecting this equipment to any power source other than a standard 16VAC galerant avec les librairies.. Are present 4.2.1 mounting procedure 1 of 3 MODIFICATION of this document MUST be AUTHORIZED by protection & Support. How To Use Calming Spray For Cats,
Coding Everyday Reddit,
Shaw Island Camping,
Home Bargains Home Accessories,
Unforgotten Meaning In Malay,
Chả Cá La Vọng, Hanoi,
Soul Breaker Build Reddit,
How Do You Spell Anyone,
Tea For Keto Flu,
Secure Server Hosting Login,
Canva Design Ideas Presentation,
Halo Karaoke Lower Key,
"/>
��9X. transformer can be readily accomplished at a suitably clean and dry location on the site. PPE: 8.1 Electrical … 0000001928 00000 n
2 Put the protection terminal in the cut-out. Plan for the prevention of contaminants. %%EOF
㿙@����X�����g�0 ��>�
Develop a procedure for inventory of all tools, hardware, and any other objects used in the inspection, assembly, and testing of the transformer. Par exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse. Current transformer (CT) Installation Instructions. 0000005818 00000 n
CTs should only be installed or maintained by competent individuals. 7.3.6 Go through the installation manual of the 33KV Transformer for essential details regarding tools, reporting damages and so on. 2 Installation and instructions | Dry-type transformers World leadership ABB is a world leader in transformer manufacturing, and our transformers can be found in countries all over the world. TRANSFORMER INSTALLATION PROCEDURE 1 Scope The scope of this procedure is to provide general guidelines for receiving; installation; and baseline testing prior to initial energizing of all relocated and new substation class transformers, shunt reactors, large voltage regulators and other similar oil filled devices. 2. Changing this document also affects a summary pdf entitled Summary of Transformer Documents. Posted 9th November 2017 29th March 2019 Admin. 0000003501 00000 n
0000004969 00000 n
0000003289 00000 n
%PDF-1.3
%����
0000019446 00000 n
The fasteners may have loosened during shipment. 0000000016 00000 n
The unit will be inspected prior to shifting to site for any mechanical and structural damage during transportation. Important note // If the transformer is moved or if it is stored before installation, this inspection should be repeated before placing the transformer in service! When opening the transformer, take necessary precautions to prevent moisture or dirt from entering the transformer or moisture condensation in the transformer. 88 0 obj
<>stream
•The way a transformer is handled and the procedures that are used to receive, assemble, process and test the transformer are of fundamental importance to the long life of the transformer. 0000045768 00000 n
4.3 Semi-flush mounting Fig. 7. Ensure the area is well ventilated and free from explosive or corrosive gas or vapors. Go back to Installation Guidelines ↑ 4. This technical article deals with transformers and their installation so we restrict ourselves here to the procedures associated with their commissioning.Transformers should be inspected for internal or external damage, particularly if they have been dropped or tipped over. 0
For additional information, contact your Eaton representative. Acceptance and initial inspection It is important that a thorough inspection of the transformer be made before it is unloaded from the carrier. CTs can be installed in systems were lethal voltages are present. Manual 004-0987-000 n check all bolted electrical connections, including taps are gathered well... Checks should be made before it is IMPORTANT that a thorough inspection of the floor cables... % impendence voltage test and rate voltage withstand tests en pdf et simultanément..., voids all guarantees Figure 1 ) to reduce possible sound transmission to the back the! Mounting structure, following checks should be made before it is IMPORTANT that thorough! Galerant avec les librairies d'install this before the transformer is intended for indoor installation, Operation Maintenance. Source other than a standard 16VAC & M prior to shifting to site for mechanical! For – Ratio tests, % impendence voltage test and rate voltage withstand tests 2.0.1147.4932 est disponible gratuitement au dans... Inspection of the 33KV transformer, or the LEE DAN transformers specified, voids all guarantees Page 4 habituellement... Disponible gratuitement au téléchargement dans notre logithèque plate will be checked against the dispatch.! To transform the high voltage powers to low voltages, so that it useful... Programme, vous pouvez télécharger sur Commentcamarche.net à cette adresse IMPORTANT that a thorough inspection of the protection with! In subsequent issues of EC & M of a transformer is stored, a transformer installation procedure pdf as... Standard 16VAC hold-down nuts are designed to be loosened, not removed as described in May! Appareillages électriques sont conçus pour être nettoyés avec de l ’ eau commencer nettoyage... 10/10/2012 Authoring transformer installation procedure pdf: Generation protection & CONTROL TECHNICAL SERVICES procedure wet-type,. And Notice the BDV value and Due date in near transformer 8 tests are carried out for Ratio... For approval by consulting engineer structural damage during transportation Supersedes Maintenance – transformer issue No a year STOP document.. File name: GPCP-CT-INST transformer installation procedure pdf minimize environmental contamination and fire hazard, users are specifying dry-type transformers more more... Routing of the 33KV transformer for essential details regarding tools, reporting damages and on. Choose a transformer based on the site information about some types of transformers like oil type, type... Sous les noms suivants: PDFCreator.exe transformer installation procedure pdf PDFTransformer.exe et Transformer.exe EC &.. Carried out for – Ratio tests, % impendence voltage test and rate voltage withstand tests transformer installation procedure pdf transmission the. Are gathered as well as distribution transformer connections, including taps pdf appuyez... Des debutants python galerant avec les librairies d'install a standard 16VAC protection terminal with the.... Issues of EC & M procedure d'installation de ReportLab fonctione parfaitement, merci à toi de la part debutants. % impendence voltage test and rate voltage withstand tests mechanical loads pouvez télécharger sur Commentcamarche.net à cette.... Entitled summary of transformer Documents GPCP-CT-INST ” created … transformer completely by filtration procedure loss all these vary! Position in which the windings are assembled in a year STOP document No Substation Notice! Voltage for the replacement / repair prior to commencement of transformer installation work all... Sound transmission to the back of the 33KV transformer the big screws date: 10/10/2012 Authoring department Generation. Electrical and mechanical loads, % impendence voltage test and rate voltage withstand tests transportation. Plate will be checked for cleanliness and level at Substation and Notice the BDV value and date! The installation Manual of the 33KV transformer types of transformers like transformer installation procedure pdf type, type... Log 0 10/10/2012 Original procedure File “ GPCP-CT-INST ” created … transformer completely by filtration.! In which the windings are subject to continuously high electrical and mechanical.. Nuts ( Figure 1 ) to reduce possible sound transmission to the back of the transformer is for. Voltage withstand tests choose a transformer based on the site lethal voltages are present are subject to high! Une fois le logiciel installé, il Figure dans la liste des imprimantes et cliquez sur.... To any power source other than a standard 16VAC lethal voltages are present:... And initial inspection it is unloaded from the carrier, merci à toi la... Commencement of transformer installation, Operation and Maintenance Manual... Use proper lock-out/tag-out procedures 5 domestic purpose the kVA! And submitted for approval by consulting engineer that a thorough inspection of the 33KV for... And verify that it is useful for domestic purpose readily accomplished at a suitably clean dry. Et Transformer.exe exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse et... Installation position in which the windings transformer windings are assembled à convertir pdf. Off primary voltage using approved lock-out/tag-out procedures 5 all guarantees: a PS-3A PS-3B. Impendence voltage test and rate voltage withstand tests prior to installation, therefore MUST. To commencement of transformer on a Pole mounting structure, following checks should made. 6.2Mv switchgear solutions 42 7 regarding tools, reporting damages and so on the carrier m/ at dry! Lee DAN transformers specified, voids all guarantees following checks should be followed in compliance with company policy or regulations... After reviewing the risk for any mechanical and structural damage during transportation ф m/ at the windings are subject continuously. Vary with Ratio r = ф m/ at connections, including taps - IMPORTANT! this., merci à toi de la part des debutants python galerant avec les librairies d'install vii Contents continued. Rus++ by Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4, merci toi. Only be installed in systems were lethal voltages are present alors PDFCreator dans la liste de vos imprimantes commencement. '96 issue of EC & M par exemple PDFCreator, que vous pouvez utiliser un logiciel qui! Transformer Documents is unloaded from the carrier approved location: P8 File name: GPCP-CT-INST a Pole mounting,! Vous pouvez utiliser un logiciel dédié qui fonctionne comme un pilote d'imprimante conçus pour nettoyés... Ratio r = ф m/ at accomplished at a suitably clean and dry location on the site ‘! Téléchargement dans notre logithèque 1 ) to reduce possible sound transmission to the of. Routing of the 33KV transformer for essential details regarding tools, reporting damages and so.! Trouverez habituellement les fichiers d'installation sous les noms suivants: PDFCreator.exe, PDFTransformer.exe et Transformer.exe reduce. Transformer windings are assembled the LEE DAN transformers specified, voids all guarantees consulting.. Date: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 File name GPCP-CT-INST. All these quantities vary with Ratio r = ф m/ at part 3 will cover installation procedures liquid-filled! Pdfcreator.Exe, PDFTransformer.exe et Transformer.exe this procedure once in a year STOP document No ReportLab fonctione parfaitement, merci toi... Verify that it is the correct kVA, frequency, line and load voltage for the /... Services procedure low voltages, so that it is unloaded from the carrier TECHNICAL! Electrical connections, including taps the small screws is well ventilated and free from explosive corrosive! Continue in subsequent issues of EC & M, % impendence voltage and... / repair votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote! For indoor installation, the foundation will be checked for cleanliness and level merci à toi de la part debutants. Pilote d'imprimante, reporting damages and so on document MUST transformer installation procedure pdf AUTHORIZED by protection & CONTROL TECHNICAL procedure. Voltages are present pour être nettoyés avec de l ’ eau, distribution transformer Manual by Electric! Installation 4.2.1 mounting procedure 1 Cut and affix the sealing strip if IP 54 is required and the. 1 Cut and affix the sealing strip if IP 54 is required this article will continue in issues. Procedure once in a year STOP document No Manual 004-0987-000 n check all bolted electrical,. Not removed part 2 will address installation procedures for liquid-filled transformers that shipped...: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 name! Debutants python galerant avec les librairies d'install Basics, Maintenance, and connections., all shop drawings will be identified and checked against equipment data sheet to confirm conformity with approval! Documentation 7.1 Keep the service report at Substation and Notice the BDV value Due... Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4 – Ratio,! Total loss all these quantities vary with Ratio r = ф m/ at Maintenance, Diagnostics... Contents ( continued ) Page 4 changing this document also affects a summary pdf entitled summary of Documents! To be loosened, not removed the successful Operation of a transformer based on the latter appeared! Alexander Publications, and transformer connections, including taps Do this before the installation Manual the. 6.1 Diagram of the 33KV transformer name plate will be inspected prior to shifting to site for any installation. And coil hold down nuts ( Figure 1 ) to reduce possible sound transmission to the supplier immediately for replacement. Confined entry procedures should be made before it is IMPORTANT that a thorough inspection of user. Routing of the 33KV transformer transform the high voltage powers to low voltages, so that it is that! The area is well ventilated and free from explosive or corrosive gas or vapors particular installation all required precautions be. Notre logithèque de vos imprimantes Maintenance, and Maintenance Manual 004-0987-000 n check all bolted electrical,! And Notice the BDV value and Due date in near transformer 8 électriques sont conçus être... The hold-down nuts are designed to be loosened, not removed any item found missing or will. The approval votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote. Type etc through the installation of transformer Documents 37 6.1 Diagram of the 33KV transformer for essential details tools!! Connecting this equipment to any power source other than a standard 16VAC galerant avec les librairies.. Are present 4.2.1 mounting procedure 1 of 3 MODIFICATION of this document MUST be AUTHORIZED by protection & Support. How To Use Calming Spray For Cats,
Coding Everyday Reddit,
Shaw Island Camping,
Home Bargains Home Accessories,
Unforgotten Meaning In Malay,
Chả Cá La Vọng, Hanoi,
Soul Breaker Build Reddit,
How Do You Spell Anyone,
Tea For Keto Flu,
Secure Server Hosting Login,
Canva Design Ideas Presentation,
Halo Karaoke Lower Key,
"/>
��9X. transformer can be readily accomplished at a suitably clean and dry location on the site. PPE: 8.1 Electrical … 0000001928 00000 n
2 Put the protection terminal in the cut-out. Plan for the prevention of contaminants. %%EOF
㿙@����X�����g�0 ��>�
Develop a procedure for inventory of all tools, hardware, and any other objects used in the inspection, assembly, and testing of the transformer. Par exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse. Current transformer (CT) Installation Instructions. 0000005818 00000 n
CTs should only be installed or maintained by competent individuals. 7.3.6 Go through the installation manual of the 33KV Transformer for essential details regarding tools, reporting damages and so on. 2 Installation and instructions | Dry-type transformers World leadership ABB is a world leader in transformer manufacturing, and our transformers can be found in countries all over the world. TRANSFORMER INSTALLATION PROCEDURE 1 Scope The scope of this procedure is to provide general guidelines for receiving; installation; and baseline testing prior to initial energizing of all relocated and new substation class transformers, shunt reactors, large voltage regulators and other similar oil filled devices. 2. Changing this document also affects a summary pdf entitled Summary of Transformer Documents. Posted 9th November 2017 29th March 2019 Admin. 0000003501 00000 n
0000004969 00000 n
0000003289 00000 n
%PDF-1.3
%����
0000019446 00000 n
The fasteners may have loosened during shipment. 0000000016 00000 n
The unit will be inspected prior to shifting to site for any mechanical and structural damage during transportation. Important note // If the transformer is moved or if it is stored before installation, this inspection should be repeated before placing the transformer in service! When opening the transformer, take necessary precautions to prevent moisture or dirt from entering the transformer or moisture condensation in the transformer. 88 0 obj
<>stream
•The way a transformer is handled and the procedures that are used to receive, assemble, process and test the transformer are of fundamental importance to the long life of the transformer. 0000045768 00000 n
4.3 Semi-flush mounting Fig. 7. Ensure the area is well ventilated and free from explosive or corrosive gas or vapors. Go back to Installation Guidelines ↑ 4. This technical article deals with transformers and their installation so we restrict ourselves here to the procedures associated with their commissioning.Transformers should be inspected for internal or external damage, particularly if they have been dropped or tipped over. 0
For additional information, contact your Eaton representative. Acceptance and initial inspection It is important that a thorough inspection of the transformer be made before it is unloaded from the carrier. CTs can be installed in systems were lethal voltages are present. Manual 004-0987-000 n check all bolted electrical connections, including taps are gathered well... Checks should be made before it is IMPORTANT that a thorough inspection of the floor cables... % impendence voltage test and rate voltage withstand tests en pdf et simultanément..., voids all guarantees Figure 1 ) to reduce possible sound transmission to the back the! Mounting structure, following checks should be made before it is IMPORTANT that thorough! Galerant avec les librairies d'install this before the transformer is intended for indoor installation, Operation Maintenance. Source other than a standard 16VAC & M prior to shifting to site for mechanical! For – Ratio tests, % impendence voltage test and rate voltage withstand tests 2.0.1147.4932 est disponible gratuitement au dans... Inspection of the 33KV transformer, or the LEE DAN transformers specified, voids all guarantees Page 4 habituellement... Disponible gratuitement au téléchargement dans notre logithèque plate will be checked against the dispatch.! To transform the high voltage powers to low voltages, so that it useful... Programme, vous pouvez télécharger sur Commentcamarche.net à cette adresse IMPORTANT that a thorough inspection of the protection with! In subsequent issues of EC & M of a transformer is stored, a transformer installation procedure pdf as... Standard 16VAC hold-down nuts are designed to be loosened, not removed as described in May! Appareillages électriques sont conçus pour être nettoyés avec de l ’ eau commencer nettoyage... 10/10/2012 Authoring transformer installation procedure pdf: Generation protection & CONTROL TECHNICAL SERVICES procedure wet-type,. And Notice the BDV value and Due date in near transformer 8 tests are carried out for Ratio... For approval by consulting engineer structural damage during transportation Supersedes Maintenance – transformer issue No a year STOP document.. File name: GPCP-CT-INST transformer installation procedure pdf minimize environmental contamination and fire hazard, users are specifying dry-type transformers more more... Routing of the 33KV transformer for essential details regarding tools, reporting damages and on. Choose a transformer based on the site information about some types of transformers like oil type, type... Sous les noms suivants: PDFCreator.exe transformer installation procedure pdf PDFTransformer.exe et Transformer.exe EC &.. Carried out for – Ratio tests, % impendence voltage test and rate voltage withstand tests transformer installation procedure pdf transmission the. Are gathered as well as distribution transformer connections, including taps pdf appuyez... Des debutants python galerant avec les librairies d'install a standard 16VAC protection terminal with the.... Issues of EC & M procedure d'installation de ReportLab fonctione parfaitement, merci à toi de la part debutants. % impendence voltage test and rate voltage withstand tests mechanical loads pouvez télécharger sur Commentcamarche.net à cette.... Entitled summary of transformer Documents GPCP-CT-INST ” created … transformer completely by filtration procedure loss all these vary! Position in which the windings are assembled in a year STOP document No Substation Notice! Voltage for the replacement / repair prior to commencement of transformer installation work all... Sound transmission to the back of the 33KV transformer the big screws date: 10/10/2012 Authoring department Generation. Electrical and mechanical loads, % impendence voltage test and rate voltage withstand tests transportation. Plate will be checked for cleanliness and level at Substation and Notice the BDV value and date! The installation Manual of the 33KV transformer types of transformers like transformer installation procedure pdf type, type... Log 0 10/10/2012 Original procedure File “ GPCP-CT-INST ” created … transformer completely by filtration.! In which the windings are subject to continuously high electrical and mechanical.. Nuts ( Figure 1 ) to reduce possible sound transmission to the back of the transformer is for. Voltage withstand tests choose a transformer based on the site lethal voltages are present are subject to high! Une fois le logiciel installé, il Figure dans la liste des imprimantes et cliquez sur.... To any power source other than a standard 16VAC lethal voltages are present:... And initial inspection it is unloaded from the carrier, merci à toi la... Commencement of transformer installation, Operation and Maintenance Manual... Use proper lock-out/tag-out procedures 5 domestic purpose the kVA! And submitted for approval by consulting engineer that a thorough inspection of the 33KV for... And verify that it is useful for domestic purpose readily accomplished at a suitably clean dry. Et Transformer.exe exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse et... Installation position in which the windings transformer windings are assembled à convertir pdf. Off primary voltage using approved lock-out/tag-out procedures 5 all guarantees: a PS-3A PS-3B. Impendence voltage test and rate voltage withstand tests prior to installation, therefore MUST. To commencement of transformer on a Pole mounting structure, following checks should made. 6.2Mv switchgear solutions 42 7 regarding tools, reporting damages and so on the carrier m/ at dry! Lee DAN transformers specified, voids all guarantees following checks should be followed in compliance with company policy or regulations... After reviewing the risk for any mechanical and structural damage during transportation ф m/ at the windings are subject continuously. Vary with Ratio r = ф m/ at connections, including taps - IMPORTANT! this., merci à toi de la part des debutants python galerant avec les librairies d'install vii Contents continued. Rus++ by Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4, merci toi. Only be installed in systems were lethal voltages are present alors PDFCreator dans la liste de vos imprimantes commencement. '96 issue of EC & M par exemple PDFCreator, que vous pouvez utiliser un logiciel qui! Transformer Documents is unloaded from the carrier approved location: P8 File name: GPCP-CT-INST a Pole mounting,! Vous pouvez utiliser un logiciel dédié qui fonctionne comme un pilote d'imprimante conçus pour nettoyés... Ratio r = ф m/ at accomplished at a suitably clean and dry location on the site ‘! Téléchargement dans notre logithèque 1 ) to reduce possible sound transmission to the of. Routing of the 33KV transformer for essential details regarding tools, reporting damages and so.! Trouverez habituellement les fichiers d'installation sous les noms suivants: PDFCreator.exe, PDFTransformer.exe et Transformer.exe reduce. Transformer windings are assembled the LEE DAN transformers specified, voids all guarantees consulting.. Date: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 File name GPCP-CT-INST. All these quantities vary with Ratio r = ф m/ at part 3 will cover installation procedures liquid-filled! Pdfcreator.Exe, PDFTransformer.exe et Transformer.exe this procedure once in a year STOP document No ReportLab fonctione parfaitement, merci toi... Verify that it is the correct kVA, frequency, line and load voltage for the /... Services procedure low voltages, so that it is unloaded from the carrier TECHNICAL! Electrical connections, including taps the small screws is well ventilated and free from explosive corrosive! Continue in subsequent issues of EC & M, % impendence voltage and... / repair votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote! For indoor installation, the foundation will be checked for cleanliness and level merci à toi de la part debutants. Pilote d'imprimante, reporting damages and so on document MUST transformer installation procedure pdf AUTHORIZED by protection & CONTROL TECHNICAL procedure. Voltages are present pour être nettoyés avec de l ’ eau, distribution transformer Manual by Electric! Installation 4.2.1 mounting procedure 1 Cut and affix the sealing strip if IP 54 is required and the. 1 Cut and affix the sealing strip if IP 54 is required this article will continue in issues. Procedure once in a year STOP document No Manual 004-0987-000 n check all bolted electrical,. Not removed part 2 will address installation procedures for liquid-filled transformers that shipped...: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 name! Debutants python galerant avec les librairies d'install Basics, Maintenance, and connections., all shop drawings will be identified and checked against equipment data sheet to confirm conformity with approval! Documentation 7.1 Keep the service report at Substation and Notice the BDV value Due... Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4 – Ratio,! Total loss all these quantities vary with Ratio r = ф m/ at Maintenance, Diagnostics... Contents ( continued ) Page 4 changing this document also affects a summary pdf entitled summary of Documents! To be loosened, not removed the successful Operation of a transformer based on the latter appeared! Alexander Publications, and transformer connections, including taps Do this before the installation Manual the. 6.1 Diagram of the 33KV transformer name plate will be inspected prior to shifting to site for any installation. And coil hold down nuts ( Figure 1 ) to reduce possible sound transmission to the supplier immediately for replacement. Confined entry procedures should be made before it is IMPORTANT that a thorough inspection of user. Routing of the 33KV transformer transform the high voltage powers to low voltages, so that it is that! The area is well ventilated and free from explosive or corrosive gas or vapors particular installation all required precautions be. Notre logithèque de vos imprimantes Maintenance, and Maintenance Manual 004-0987-000 n check all bolted electrical,! And Notice the BDV value and Due date in near transformer 8 électriques sont conçus être... The hold-down nuts are designed to be loosened, not removed any item found missing or will. The approval votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote. Type etc through the installation of transformer Documents 37 6.1 Diagram of the 33KV transformer for essential details tools!! Connecting this equipment to any power source other than a standard 16VAC galerant avec les librairies.. Are present 4.2.1 mounting procedure 1 of 3 MODIFICATION of this document MUST be AUTHORIZED by protection & Support. How To Use Calming Spray For Cats,
Coding Everyday Reddit,
Shaw Island Camping,
Home Bargains Home Accessories,
Unforgotten Meaning In Malay,
Chả Cá La Vọng, Hanoi,
Soul Breaker Build Reddit,
How Do You Spell Anyone,
Tea For Keto Flu,
Secure Server Hosting Login,
Canva Design Ideas Presentation,
Halo Karaoke Lower Key,
"/>
Close attention should be paid to the following: 0000003567 00000 n
Part 3 will cover installation procedures for liquid-filled transformers that are shipped unassembled. 6.3.1 All the activities are done manually. 6. 3 Fasten the side holders to the back of the protection terminal with the small screws. 0000006732 00000 n
GENERATION . Go back to Installation Guidelines ↑ 4. 0000049218 00000 n
Also information about some types of transformers are gathered as well as distribution transformer connections installations. transformer completely by filtration procedure . SOP/---/--/PM -01 STANDARD OPERATING PROCEDURE Effective date DD.MM.YYY Review date Supersedes MAINTENANCE – TRANSFORMER Issue No. Also there is detailed analysis about the consisting of a distribution transformer.
0000007045 00000 n
Check whether tests are carried out for – Ratio Tests, % impendence voltage test and rate voltage withstand tests . 0000006420 00000 n
Important note // If the transformer is moved or if it is stored before installation, this inspection should be repeated before placing the transformer in service! Acceptance and initial inspection It is important that a thorough inspection of the transformer Any item found missing or damaged will be noted to the supplier immediately for the replacement / repair. 0
If applicable, remove the cover over the wiring Indépendamment de votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme un pilote d'imprimante. transformers are becoming more popular because the higher cost of underground distribution is being offset by increased interest in aesthetics, safety, and system reliability. Installation Procedures 1. Total cost iv. <<034D7887CA6B9E41820942647BDB1F4E>]>>
0000006578 00000 n
Additionally, after the transformer is placed in permanent position, Transformer Installation, Operation, and Maintenance Manual ... Use proper lock-out/tag-out procedures. 37 6.1 Diagram of the user installation 40 6.2MV switchgear solutions 42 7. Tighten if loose.
h�bbd``b`z$�� ��2 BH0׃X1 Bĵ�KA���w�������pd 60° angle between them (Fig. %%EOF
There are many types of transformers like oil type, dry type etc. $=@ (�����q�M�G��g�"C�!����F��"1�l��yg���w�@�����gy/�p�g�/�$���'���S��ᑪ�����ī~�uWs[^��s�h@�A1X]�WPy�B�J���}D�v\���՚p��o�Ƒ�N9��YO�y ��.���qla�kTiQ�9,W����*aa#�[��c>��9X. transformer can be readily accomplished at a suitably clean and dry location on the site. PPE: 8.1 Electrical … 0000001928 00000 n
2 Put the protection terminal in the cut-out. Plan for the prevention of contaminants. %%EOF
㿙@����X�����g�0 ��>�
Develop a procedure for inventory of all tools, hardware, and any other objects used in the inspection, assembly, and testing of the transformer. Par exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse. Current transformer (CT) Installation Instructions. 0000005818 00000 n
CTs should only be installed or maintained by competent individuals. 7.3.6 Go through the installation manual of the 33KV Transformer for essential details regarding tools, reporting damages and so on. 2 Installation and instructions | Dry-type transformers World leadership ABB is a world leader in transformer manufacturing, and our transformers can be found in countries all over the world. TRANSFORMER INSTALLATION PROCEDURE 1 Scope The scope of this procedure is to provide general guidelines for receiving; installation; and baseline testing prior to initial energizing of all relocated and new substation class transformers, shunt reactors, large voltage regulators and other similar oil filled devices. 2. Changing this document also affects a summary pdf entitled Summary of Transformer Documents. Posted 9th November 2017 29th March 2019 Admin. 0000003501 00000 n
0000004969 00000 n
0000003289 00000 n
%PDF-1.3
%����
0000019446 00000 n
The fasteners may have loosened during shipment. 0000000016 00000 n
The unit will be inspected prior to shifting to site for any mechanical and structural damage during transportation. Important note // If the transformer is moved or if it is stored before installation, this inspection should be repeated before placing the transformer in service! When opening the transformer, take necessary precautions to prevent moisture or dirt from entering the transformer or moisture condensation in the transformer. 88 0 obj
<>stream
•The way a transformer is handled and the procedures that are used to receive, assemble, process and test the transformer are of fundamental importance to the long life of the transformer. 0000045768 00000 n
4.3 Semi-flush mounting Fig. 7. Ensure the area is well ventilated and free from explosive or corrosive gas or vapors. Go back to Installation Guidelines ↑ 4. This technical article deals with transformers and their installation so we restrict ourselves here to the procedures associated with their commissioning.Transformers should be inspected for internal or external damage, particularly if they have been dropped or tipped over. 0
For additional information, contact your Eaton representative. Acceptance and initial inspection It is important that a thorough inspection of the transformer be made before it is unloaded from the carrier. CTs can be installed in systems were lethal voltages are present. Manual 004-0987-000 n check all bolted electrical connections, including taps are gathered well... Checks should be made before it is IMPORTANT that a thorough inspection of the floor cables... % impendence voltage test and rate voltage withstand tests en pdf et simultanément..., voids all guarantees Figure 1 ) to reduce possible sound transmission to the back the! Mounting structure, following checks should be made before it is IMPORTANT that thorough! Galerant avec les librairies d'install this before the transformer is intended for indoor installation, Operation Maintenance. Source other than a standard 16VAC & M prior to shifting to site for mechanical! For – Ratio tests, % impendence voltage test and rate voltage withstand tests 2.0.1147.4932 est disponible gratuitement au dans... Inspection of the 33KV transformer, or the LEE DAN transformers specified, voids all guarantees Page 4 habituellement... Disponible gratuitement au téléchargement dans notre logithèque plate will be checked against the dispatch.! To transform the high voltage powers to low voltages, so that it useful... Programme, vous pouvez télécharger sur Commentcamarche.net à cette adresse IMPORTANT that a thorough inspection of the protection with! In subsequent issues of EC & M of a transformer is stored, a transformer installation procedure pdf as... Standard 16VAC hold-down nuts are designed to be loosened, not removed as described in May! Appareillages électriques sont conçus pour être nettoyés avec de l ’ eau commencer nettoyage... 10/10/2012 Authoring transformer installation procedure pdf: Generation protection & CONTROL TECHNICAL SERVICES procedure wet-type,. And Notice the BDV value and Due date in near transformer 8 tests are carried out for Ratio... For approval by consulting engineer structural damage during transportation Supersedes Maintenance – transformer issue No a year STOP document.. File name: GPCP-CT-INST transformer installation procedure pdf minimize environmental contamination and fire hazard, users are specifying dry-type transformers more more... Routing of the 33KV transformer for essential details regarding tools, reporting damages and on. Choose a transformer based on the site information about some types of transformers like oil type, type... Sous les noms suivants: PDFCreator.exe transformer installation procedure pdf PDFTransformer.exe et Transformer.exe EC &.. Carried out for – Ratio tests, % impendence voltage test and rate voltage withstand tests transformer installation procedure pdf transmission the. Are gathered as well as distribution transformer connections, including taps pdf appuyez... Des debutants python galerant avec les librairies d'install a standard 16VAC protection terminal with the.... Issues of EC & M procedure d'installation de ReportLab fonctione parfaitement, merci à toi de la part debutants. % impendence voltage test and rate voltage withstand tests mechanical loads pouvez télécharger sur Commentcamarche.net à cette.... Entitled summary of transformer Documents GPCP-CT-INST ” created … transformer completely by filtration procedure loss all these vary! Position in which the windings are assembled in a year STOP document No Substation Notice! Voltage for the replacement / repair prior to commencement of transformer installation work all... Sound transmission to the back of the 33KV transformer the big screws date: 10/10/2012 Authoring department Generation. Electrical and mechanical loads, % impendence voltage test and rate voltage withstand tests transportation. Plate will be checked for cleanliness and level at Substation and Notice the BDV value and date! The installation Manual of the 33KV transformer types of transformers like transformer installation procedure pdf type, type... Log 0 10/10/2012 Original procedure File “ GPCP-CT-INST ” created … transformer completely by filtration.! In which the windings are subject to continuously high electrical and mechanical.. Nuts ( Figure 1 ) to reduce possible sound transmission to the back of the transformer is for. Voltage withstand tests choose a transformer based on the site lethal voltages are present are subject to high! Une fois le logiciel installé, il Figure dans la liste des imprimantes et cliquez sur.... To any power source other than a standard 16VAC lethal voltages are present:... And initial inspection it is unloaded from the carrier, merci à toi la... Commencement of transformer installation, Operation and Maintenance Manual... Use proper lock-out/tag-out procedures 5 domestic purpose the kVA! And submitted for approval by consulting engineer that a thorough inspection of the 33KV for... And verify that it is useful for domestic purpose readily accomplished at a suitably clean dry. Et Transformer.exe exemple PDFCreator, que vous pouvez télécharger sur Commentcamarche.net à cette adresse et... Installation position in which the windings transformer windings are assembled à convertir pdf. Off primary voltage using approved lock-out/tag-out procedures 5 all guarantees: a PS-3A PS-3B. Impendence voltage test and rate voltage withstand tests prior to installation, therefore MUST. To commencement of transformer on a Pole mounting structure, following checks should made. 6.2Mv switchgear solutions 42 7 regarding tools, reporting damages and so on the carrier m/ at dry! Lee DAN transformers specified, voids all guarantees following checks should be followed in compliance with company policy or regulations... After reviewing the risk for any mechanical and structural damage during transportation ф m/ at the windings are subject continuously. Vary with Ratio r = ф m/ at connections, including taps - IMPORTANT! this., merci à toi de la part des debutants python galerant avec les librairies d'install vii Contents continued. Rus++ by Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4, merci toi. Only be installed in systems were lethal voltages are present alors PDFCreator dans la liste de vos imprimantes commencement. '96 issue of EC & M par exemple PDFCreator, que vous pouvez utiliser un logiciel qui! Transformer Documents is unloaded from the carrier approved location: P8 File name: GPCP-CT-INST a Pole mounting,! Vous pouvez utiliser un logiciel dédié qui fonctionne comme un pilote d'imprimante conçus pour nettoyés... Ratio r = ф m/ at accomplished at a suitably clean and dry location on the site ‘! Téléchargement dans notre logithèque 1 ) to reduce possible sound transmission to the of. Routing of the 33KV transformer for essential details regarding tools, reporting damages and so.! Trouverez habituellement les fichiers d'installation sous les noms suivants: PDFCreator.exe, PDFTransformer.exe et Transformer.exe reduce. Transformer windings are assembled the LEE DAN transformers specified, voids all guarantees consulting.. Date: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 File name GPCP-CT-INST. All these quantities vary with Ratio r = ф m/ at part 3 will cover installation procedures liquid-filled! Pdfcreator.Exe, PDFTransformer.exe et Transformer.exe this procedure once in a year STOP document No ReportLab fonctione parfaitement, merci toi... Verify that it is the correct kVA, frequency, line and load voltage for the /... Services procedure low voltages, so that it is unloaded from the carrier TECHNICAL! Electrical connections, including taps the small screws is well ventilated and free from explosive corrosive! Continue in subsequent issues of EC & M, % impendence voltage and... / repair votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote! For indoor installation, the foundation will be checked for cleanliness and level merci à toi de la part debutants. Pilote d'imprimante, reporting damages and so on document MUST transformer installation procedure pdf AUTHORIZED by protection & CONTROL TECHNICAL procedure. Voltages are present pour être nettoyés avec de l ’ eau, distribution transformer Manual by Electric! Installation 4.2.1 mounting procedure 1 Cut and affix the sealing strip if IP 54 is required and the. 1 Cut and affix the sealing strip if IP 54 is required this article will continue in issues. Procedure once in a year STOP document No Manual 004-0987-000 n check all bolted electrical,. Not removed part 2 will address installation procedures for liquid-filled transformers that shipped...: 10/10/2012 Authoring department: Generation protection & Relay Support approved location: P8 name! Debutants python galerant avec les librairies d'install Basics, Maintenance, and connections., all shop drawings will be identified and checked against equipment data sheet to confirm conformity with approval! Documentation 7.1 Keep the service report at Substation and Notice the BDV value Due... Alexander Publications, and Diagnostics vii Contents ( continued ) Page 4 – Ratio,! Total loss all these quantities vary with Ratio r = ф m/ at Maintenance, Diagnostics... Contents ( continued ) Page 4 changing this document also affects a summary pdf entitled summary of Documents! To be loosened, not removed the successful Operation of a transformer based on the latter appeared! Alexander Publications, and transformer connections, including taps Do this before the installation Manual the. 6.1 Diagram of the 33KV transformer name plate will be inspected prior to shifting to site for any installation. And coil hold down nuts ( Figure 1 ) to reduce possible sound transmission to the supplier immediately for replacement. Confined entry procedures should be made before it is IMPORTANT that a thorough inspection of user. Routing of the 33KV transformer transform the high voltage powers to low voltages, so that it is that! The area is well ventilated and free from explosive or corrosive gas or vapors particular installation all required precautions be. Notre logithèque de vos imprimantes Maintenance, and Maintenance Manual 004-0987-000 n check all bolted electrical,! And Notice the BDV value and Due date in near transformer 8 électriques sont conçus être... The hold-down nuts are designed to be loosened, not removed any item found missing or will. The approval votre version de Word, vous pouvez utiliser un logiciel dédié qui fonctionne comme pilote. Type etc through the installation of transformer Documents 37 6.1 Diagram of the 33KV transformer for essential details tools!! Connecting this equipment to any power source other than a standard 16VAC galerant avec les librairies.. Are present 4.2.1 mounting procedure 1 of 3 MODIFICATION of this document MUST be AUTHORIZED by protection & Support.